A few pictures from last weeks work on Fulbourne. We arrived in the Tuesday and dave showed us the new (almost ) engine rockers
We wondered if it would be easier to keep it as a working boats :-)
We put a few panels down to give me a bed!
Luxury accommodation :-(
Dave had found a couple of rusted sections of the engine room sides which he had made good
Same on the other side
Daves painter had not managed to do the upper part of the engine room painting so we will need to do this ourselves
In the morning we went to Norton Canes, it was a bit obvious that we hadn't been there for a while!
The hired van was just long enough!
The loaded van
Engine room plates
A shiny engine room and fuel tanks
Dave used his steel chisel to make some minor adjustments to the water tank stand
He also painted the engine
Putting up the top planks
Putting the water tank support in place
Cratch!
Wednesday night Pizza :-)
Welding the water tank to the boat
Some of the floor panels are past there sell by date!
Clothed up
Inside
The engine room roof edges painted
We have a lot of ballast to reinstall!